Data Google Scholar

Showing 17,561-17,580 of 36,847 items.
TitleNama#
 
Motives And Green Innovation Performance in Indonesian Small and Medium Enterprises (Sme’s) Batik - A Qualitative Case StudyDr Drs AGUS SUROSODetil
The Effect of Event Image on Revisit Intention with Perceived Value as a Mediating VariableDr Drs AGUS SUROSODetil
Analisis Pengaruh Sistem Manajemen Mutu terhadap Kualitas Proyek pada Proyek Konstruksi Gedung Bertingkat TinggiDr Drs AGUS SUROSODetil
COST OVERRUN AKIBAT DESAIN, ESTIMASI DAN REWORK SEBELUM IMPLEMENTASI KONSTRUKSI DIGITAL PADA KINERJA BIAYA KONSTRUKSI GEDUNG INDONESIADr Drs AGUS SUROSODetil
PENGARUH CONTRACT CHANGE ORDER (CCO) TERHADAP KINERJA BIAYA PADA PROYEK HUNIAN BERTINGKAT TINGGIDr Drs AGUS SUROSODetil
PENGARUH HYDRAULIC ENGINEERING SOFTWARE TERHADAP KINERJA WAKTU PEKERJAAN DESAIN JARINGAN PERPIPAAN AIR LIMBAH SKALA KOTADr Drs AGUS SUROSODetil
FAKTOR DOKUMEN KONTRAK DAN STAKEHOLDER TERHADAP BIAYA PROYEK PEMBANGUNAN JALAN TOLDr Drs AGUS SUROSODetil
Analisis Pengaruh Penggunaan Hydraulic Engineering Software Terhadap Kinerja Waktu Proyek Perencanaan Sistem Pengelolaan Air Limbah Domestik Terpusat (SPALD-T) Skala KotaDr Drs AGUS SUROSODetil
Numerical Analysis of Non-minimal Coupling and Non-minimal Derivative Coupling Models using Direct Random MethodDr Drs AGUS SUROSODetil
Minimal length, nuclear matter, and neutron starsDr Drs AGUS SUROSODetil
The Impact of Ethical Leadership and Motivation to Innovative Work Behavior with Friendly Relationship Knowledge Sharing Mediating Variables in Small Medium Enterprises (SMEs).Dr Drs AGUS SUROSODetil
Thin-shell Solution of Chameleon Mechanism in Brans-Dicke Scalar-Tensor ModelDr Drs AGUS SUROSODetil
Gravitational Wave Propagation for The Generalized Proca TheoriesDr Drs AGUS SUROSODetil
Penerapan Common Data Environment Berbasis Model UTAUT Pada Proyek BendunganDr Drs AGUS SUROSODetil
PERAN PEMANGKU KEPANTINGAN TERHADAP FAKTOR-FAKTOR RISIKO PADA PROYEK KPBU JALAN TOL UNSOLICITEDDr Drs AGUS SUROSODetil
FAKTOR-FAKTOR YANG MEMPENGARUHI TINGKAT PENERAPAN BIM (BUILDING INFORMATION MODELLING) 4D DI BUMN KONSTRUKSIDr Drs AGUS SUROSODetil
PENGARUH ESTIMATING SOFTWARE UNTUK MENCAPAI KINERJA ANGGARAN YANG LEBIH AKURAT PADA KONSTRUKSI GEDUNGDr Drs AGUS SUROSODetil
Unjuk Kerja Hidrograf Satuan Sintetik Nakayasu, Itb 2 Dan Limantara Untuk Daerah Aliran Sungai Berbentuk MemanjangDr Drs AGUS SUROSODetil
Cost Overrun Akibat Desain, Estimasi, dan Rework Setelah Implementasi Konstruksi Digital Pada Kinerja Biaya Konstruksi Gedung IndonesiaDr Drs AGUS SUROSODetil
The Application of Two Tsunami Inundation Model in the Kuta Mandalika CoastDr Drs AGUS SUROSODetil