21 | RANCANGAN SISTEM PENDUKUNG KEPUTUSAN UNTUK PENERIMAAN PESANAN PADA PERUSAHAAN MAKE TO ORDER DENGAN MODEL MATEMATIKA OPTIMASI | JURNAL REKAYASA SISTEM INDUSTRI 5 (1), 35-40 | Authors: I Prakoso, K Hanim | 2019 | 0 |
22 | ANALISIS TOTAL PRODUCTIVE MAINTENANCE (TPM) MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN DROP LIFTER 2 PAINTING BODY STORAGE (DL-2 PBS) DI PT. SUZUKI INDOMOBIL … | CIEHIS Prosiding 1 (1), 160-168 | Authors: A Rahmalia, I Prakoso | 2019 | 0 |
23 | RANCANGAN SISTEM PENDUKUNG KEPUTUSAN UNTUK PENERIMAAN PESANAN PADA PERUSAHAAN MAKE TO ORDER DENGAN MODEL MATEMATIKA OPTIMASI: RANCANGAN SISTEM PENDUKUNG KEPUTUSAN UNTUK … | JURNAL REKAYASA SISTEM INDUSTRI 5 (1), 35-40 | Authors: I Prakoso, K Hanim | 2019 | 0 |
24 | Penerapan Metode Klasifikasi ABC dan 5S Pada Gudang Tools PT. Mesin Isuzu Indonesia | JURNAL REKAYASA SISTEM INDUSTRI 5 (2), 90-96 | Authors: OA Putra, I Prakoso | 2020 | 1 |
25 | PENGEMBANGAN DESAIN POMPA LISTRIK SENTRIFUGAL UNTUK GALLON AIR MINUM | JURNAL REKAYASA SISTEM INDUSTRI 6 (1), 32-39 | Authors: MI Zamzani, I Prakoso | 2020 | 0 |
26 | PENERAPAN METODE KLASIFIKASI ABC DAN 5S PADA GUDANG TOOLS PT. MESIN ISUZU INDONESIA: Penerapan Metode Klasifikasi ABC dan 5S Pada Gudang Tools PT. Mesin Isuzu Indonesia | Jurnal Rekayasa Sistem Industri 5 (2), 90-96 | Authors: OA Putra, I Prakoso | 2020 | 1 |
27 | Penerapan Metode Six Sigma dalam Analisis Kualitas Produk (Studi Kasus Perusahaan Pemroduksi Baja Tulang Beton) | SPECTA Journal of Technology 4 (2), 45-54, 2020 | Authors: A Faturochman, I Prakoso, AA Sibarani, K Muhammad | 2020 | 2 |
28 | Evaluasi Kapasitas Produksi Ban Menggunakan Metode RCCP dengan Pendekatan Bola | Jurnal Rekayasa Sistem Industri 6 (1), 6-12, 2020 | Authors: TP Adhiana, I Prakoso, N Pangestika | 2020 | 3 |
29 | Struktur Rumah Sederhana Ramah Gempa untuk Meminimalisir Kerusakan dan Korban Jiwa | Madani: Indonesian Journal of Civil Society 2 (2), 43-49, 2020 | Authors: DN Saputro, R Januardi, I Prakoso | 2020 | 1 |
30 | POTENSI PENERAPAN TEKNOLOGI BETON BELERANG (SULFUR CONCRETE) PADA KONSTRUKSI DI INDONESIA | Seminar Nasional Teknologi Industri Hijau 2 (1), 150-158, 2020 | Authors: DN Saputro, R Januardi, I Prakoso | 2020 | 0 |
31 | USULAN PERBAIKAN AREA KERJA MENGGUNAKAN METODE 5S GUNA TAHAP AWAL PENERAPAN LEAN MANUFACTURING (STUDI KASUS PT. XYZ) | JURNAL REKAYASA SISTEM INDUSTRI 6 (2), 64-71 | Authors: D Priyanto, I Prakoso | 2021 | 0 |
32 | Analisis Perbandingan Produktifitas dan Efsiensi Pengiriman Material pada Sistem Aging dan Sistem Scheduling Route Menggunakan Analisis Produktifitas dan Data Envelopment … | SPECTA Journal of Technology 5 (1), 77-85 | Authors: I Prakoso, MBW Tosaili, TP Adhiana | 2021 | 0 |
33 | IMPROVEMENT OF THE WORKING SYSTEM IN MR. WASH LAUNDRY USING ERGONOMIC PARTICIPATORY METHOD | Journal of Industrial Engineering Management 6 (1), 20-25, 2021 | Authors: AS Rini, I Prakoso | 2021 | 0 |
34 | Bubble Window Product Quality Control with New Seven Tools Method (Case Study: PT X) | Jurnal Rekayasa Sistem & Industri (JRSI) 8 (02), 97-103 | Authors: AM Putra, I Prakoso | 2021 | 0 |
35 | PENDAMPINGAN PENGEMBANGAN KEMASAN DAN DIGITAL MARKETING PADA PRODUK KOPI BANYUMAS LERENG GUNUNG SLAMET, DESA MELUNG, KEDUNGBANTENG, BANYUMAS. | Prosiding 10 (1), 2021 | Authors: H Asyari, I Prakoso, S Waluyo | 2021 | 0 |
36 | Proposal Improvement to Increase Equipment Effectiveness and Reduse Waste Levels in SME Plastic Straw Prodecer with a Total Productive Maintenance Approach and Waste Assessment … | International Conference on Science and Engineering (ICSE-UIN-SUKA 2021 … | Authors: SD Jauza, I Prakoso, AA Sibarani | 2021 | 0 |
37 | PENGEMBANGAN GEOWISATA VIRTUAL DESA SUMINGKIR, KECAMATAN KUTASARI, KABUPATEN PURBALINGGA | Prosiding Seminar Nasional LPPM Unsoed 11 (1), 2022 | Authors: FXAT Laksono, I Prakoso, MR Aditama | 2022 | 0 |