Scopus Documents # A vendorâbuyer inventory model with imperfect production considering investment to reduce lead time variability
Title | A vendorâbuyer inventory model with imperfect production considering investment to reduce lead time variability |
---|---|
Quartile | 2 |
Publication Name | Cogent Engineering |
Creator | Jauhari W.A. |
Page | 1-17 |
Issn | |
Volume | 5 |
Cover Date | 2018-01-01 |
Cover Display Date | 1 January 2018 |
Doi | 10.1080/23311916.2018.1531455 |
Citedby Count | 3 |
Aggregation Type | Journal |
Url | https://www.scopus.com/record/display.uri?eid=2-s2.0-85055354637&origin=resultslist&sort=plf-f |
Author | ANINDYA RACHMA DWICAHYANI, S.T, M.T. |
File | 85055354637.pdf |