Google Documents : Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration
| Title | Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration |
|---|---|
| Abstract | |
| Authors | F Ariza, A Suroso, M Amin |
| Journal Name | Eduvest-Journal of Universal Studies 5 (3), 2716-2730, 2025 |
| Publish Year | 2025 |
| Citation | (not set) |
| Url | https://scholar.google.com/scholar?q=+intitle:"Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration" |
| Author | Dr Drs AGUS SUROSO |
| File | 9537940.pdf |