Google Documents : Ready Mix Concrete Production Scheduling and Truck Mixer Allocation Using Genetic Algorithm: A Case Study
Title | Ready Mix Concrete Production Scheduling and Truck Mixer Allocation Using Genetic Algorithm: A Case Study |
---|---|
Abstract | |
Authors | M Krisnawati, FRA Syailendri, AA Sibarani |
Journal Name | Engineering Headway 6, 303-311, 2024 |
Publish Year | 2024 |
Citation | 3 |
Url | https://scholar.google.com/scholar?q=+intitle:"Ready Mix Concrete Production Scheduling and Truck Mixer Allocation Using Genetic Algorithm: A Case Study" |
Author | Ir AYU ANGGRAENI SIBARANI, S.T, M.T |
File | 8166145.pdf |