Google Documents : A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability
| Title | A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability |
|---|---|
| Abstract | |
| Authors | WA Jauhari, M Sianipar, CN Rosyidi, AR Dwicahyani |
| Journal Name | Cogent Engineering 5 (1), 1531455, 2018 |
| Publish Year | 2018 |
| Citation | 2 |
| Url | https://scholar.google.com/scholar?q=+intitle:"A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability" |
| Author | ANINDYA RACHMA DWICAHYANI, S.T, M.T. |
| File | 1754708.pdf |