Google Documents : A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability
Title | A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability |
---|---|
Abstract | |
Authors | WA Jauhari, M Sianipar, CN Rosyidi, AR Dwicahyani |
Journal Name | Cogent Engineering 5 (1), 1531455, 2018 |
Publish Year | 2018 |
Citation | 2 |
Url | https://scholar.google.com/scholar?q=+intitle:"A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability" |
Author | ANINDYA RACHMA DWICAHYANI, S.T, M.T. |
File | 1754708.pdf |