Google Documents : A vendor-buyer inventory model with imperfect production considering investment to reduce lead time variability
| Title | A vendor-buyer inventory model with imperfect production considering investment to reduce lead time variability |
|---|---|
| Abstract | |
| Authors | WA Jauhari, M Sianipar, CN Rosyidi, AR Dwicahyani |
| Journal Name | Cogent Engineering |
| Publish Year | 2018 |
| Citation | (not set) |
| Url | https://scholar.google.com/scholar?q=+intitle:"A vendor-buyer inventory model with imperfect production considering investment to reduce lead time variability" |
| Author | ANINDYA RACHMA DWICAHYANI, S.T, M.T. |
| File | 1580403.pdf |