Google Documents : LOAD FORECASTING FOR DAILY LOAD OPERATIONAL PLAN USING LSTM (CASE STUDY: SOUTH SULAWESI SUB SYSTEM)
| Title | LOAD FORECASTING FOR DAILY LOAD OPERATIONAL PLAN USING LSTM (CASE STUDY: SOUTH SULAWESI SUB SYSTEM) |
|---|---|
| Abstract | |
| Authors | AB Raharjo, MA Wakhid, D Purwitasari |
| Journal Name | |
| Publish Year | (not set) |
| Citation | (not set) |
| Url | https://scholar.google.com/scholar?q=+intitle:"LOAD FORECASTING FOR DAILY LOAD OPERATIONAL PLAN USING LSTM (CASE STUDY: SOUTH SULAWESI SUB SYSTEM)" |
| Author | Dr AGUS RAHARJO, S.H., M.Hum |
| File | 6195192.pdf |